The short answer
A small panel can often be changed over in a single shift, while a large multi-machine panel can take several days. The biggest factor is how much of the work is finished and tested before the shutdown begins, followed by the condition of the existing field wiring.

What makes a changeover longer
- Field wiring with no labels or drawings that do not match
- A new program that has not been tested before the shutdown
- Wire that is damaged or too short to reach the new terminals
- Limited access to the panel location
- Waiting for inspection or for parts that were not on site
How to shorten it
- Survey and label the existing field wiring before the shutdown.
- Build and fully test the new panel in the shop.
- Use a terminal layout that matches the existing wiring where possible.
- Write a step-by-step cutover plan with a way to return to the old system.
- Schedule the work around a planned shutdown or holiday.
Send the builder your shutdown window at the start of the project. It affects how the panel is designed, as well as when it is installed.