Explosion-proof control panels for hazardous locations

Explosion-proof panels and operator stations built to your specification and ready to install, for plants where gas, vapour or dust is part of the job.

Explosion-proof bolted enclosure with green and red pilot lights for gas process valve control

What is an explosion-proof control panel?

An explosion-proof panel uses a heavy, bolted enclosure designed to contain an internal ignition and stop it from reaching the flammable atmosphere outside. Panels like this are used in hazardous locations, where flammable gas, vapour or dust may be present during normal or abnormal operation.

What we build

  • Explosion-proof control panels

    Bolted enclosures with controls, pilot lights and legend plates to your specification.

  • Operator stations

    Push-button and pilot-light stations for local control in the hazardous area.

  • Gas process valve control

    Panels that control and indicate valve position for gas processes.

  • Paired with gas detection

    Hazardous-area control tied into detection and alarm systems.

  • Built to spec

    We build to your engineer’s drawings and your site’s area classification.

  • Ready to install

    Tested in the shop and delivered ready for installation.

What we need to get it right

Hazardous location equipment is specified by the area it goes into. Before we quote, we confirm the area classification, the gas or dust group, the temperature code and how the panel will be wired into the field. If you are still working those out, ask early and we will tell you what your engineer needs to confirm.

Featured build

Explosion-proof bolted enclosure with green and red pilot lights for gas process valve control
Four explosion-proof push-button stations with pilot lights installed on a steel platform
Explosion-proof

Explosion-proof valve control panel

A bolted explosion-proof enclosure that controls gas process valves, with pilot lights an operator can read at a glance from across the area.

What went into it

  • Explosion-proof enclosure built to the area classification
  • Green and red pilot lights for valve status
  • Valve control wiring, labelled and tested in the shop

How a job runs

  1. 1

    Scope

    Send us your drawings or describe the process. We confirm what the system has to do, where it will live and what codes apply.

  2. 2

    Design

    We work from your engineer’s drawings or design the panel and control logic ourselves, then review it with you.

  3. 3

    Build

    Your panel is wired, labelled and laid out so the next person to open the door can follow it.

  4. 4

    Test

    Every panel and program is tested before it leaves the shop or goes live, from schematic to final check.

  5. 5

    Install

    We install, commission and hand over the system, and stay available if your process changes later.

Questions about explosion-proof panels

What information do you need to quote an explosion-proof panel?

The area classification, gas or dust group, temperature code, the devices required, and your drawings if you have them. Your engineer or safety lead will usually have this information.

Can you build from our engineer’s drawings?

Yes. Explosion-proof panels are built to spec, and working from an engineer’s package is the normal route.

Are your panels ESA certified?

Yes. All JD Automation control panels are ESA certified.

Do you build operator stations as well as panels?

Yes. We build explosion-proof push-button and pilot-light stations as well as complete panels.

Read more

Tell us what you need built

Send drawings, photos or a short description. We respond within 24 hours of your request.

Call Request a Quote